设计和施工的降雪保护tructure on the Baku-Tbilisi-Kars rail corridor, G

Author:Mikus Cirulis and Maris Cirulis

Date published

1 August 2019

Price

Standard: £9 + VAT

Members/Subscribers: Free

Back to Previous

设计和施工的降雪保护tructure on the Baku-Tbilisi-Kars rail corridor, Georgia

设计和施工的降雪保护tructure on the Baku-Tbilisi-Kars rail corridor, Georgia
The Structural Engineer
Author

Mikus Cirulis and Maris Cirulis

Date published

1 August 2019

Author

Mikus Cirulis and Maris Cirulis

Price

Standard: £9 + VAT

Members/Subscribers: Free

This project involved the design and construction of a structure comprising four tunnels with a total length of 2434m. An initialin situconcrete scheme was changed to a corrugated steel plate assembly, enabling improvements in material transportation and construction.

Additional information

Format:
PDF
Pages:
8
Publisher:
万博体育手机客户端登录

Tags

Project Focus Issue 8

Related Resources & Events

The Structural Engineer
<h4>Complete issue (August 2019)</h4>

Complete issue (August 2019)

All the articles from the August 2019 issue of The Structural Engineer

Date ‐1 August 2019
Author ‐Various
Price ‐£25
The Structural Engineer
<h4>Verulam (readers' letters - August 2019)</h4>

Verulam (readers' letters - August 2019)

This month’s letters discuss the UK government’s proposed changes to the building safety regulations and continue the debate over what constitutes subsidence or settlement, among a variety of other topics.

Date ‐1 August 2019
Author ‐Various
Price ‐£9
The Structural Engineer
<h4>Spotlight on Structures (August 2019)</h4>

Spotlight on Structures (August 2019)

The Editor-in-Chief’s latest featured article investigates least-cost design of curved cable-stayed footbridges with control devices.

Date ‐1 August 2019
Author ‐Various
Price ‐£0
Baidu